Project:

Hollywood Seminole Water Treatment Facility
Water Treatment Facility
Hollywood, Florida

[ view details ]

Project Scope
Mechanical subcontractor for the construction of three surface water wells to supply the newly constructed 1MGD nanofiltration treatment units associated degasifies. Chemical systems included chlorine solution, sodium hydroxide, sulfuric acid, and calcium chloride. Pumps and associated piping, 1 MG storage tank, standby generator and controls.

Project:

Jupiter Western Repump Station
Emergency Power/Repump Facility
Jupiter, Florida

[ view details ]

Project Scope
New construction that consists of canal access roadway, all site work and landscaping, installation of yard piping and pump cans for the future high service pumping facilities. Also included are all electrical and instrumentation for the facility, including installation of an Owner furnished emergency generator.

Project:

Jupiter Central Boulevard High Service Pump
High Service Pump
Jupiter, Florida

[ view details ]

Project Scope
Construction of a high service pump station including the installation of Owner supplied pumps with associated structural, mechanical, electrical and instrumentation provisions; erection of an Emergency Generator Building; installation of a new Owner supplied diesel engine generator and associated anchillary systems.

Project:

Town of Lantana
Water Treatment Plant Process Improvements
Lantana Water Treatment Plant

[ view details ]

Project Scope
Installation of dual media gravity filters, anion exchange/ion exchange softening systems, emergency generator & filter backwash pumps. Installation of anion/ion backwash pumps, transfer pumps, ammoniation system, brine waste storage system, prefab electrical/chemical building & all associated mechanical, electrical, structural & instrumentation.

Project:

Martin County Iron Filter System
Installation of Iron Filters
Tropical Farms Water Treatment Plant

[ view details ]

Project Scope
Five million gallon ground storage tank including subsurface soil preparation, site clearing & grading, an iron treatment facility, paving, drainage, site landscaping, removal of exotic vegetation, concrete foundations & structures, a CBS building for electrical gear, air blowers, modifications to existing building, backwash pumps, new piping, four iron removal pressure filter vessels, instrumentation and controls, painting and architectural treatments.

Project:

Solids Dewatering Plant
Construction of a solids dewatering facility
West Palm Beach

[ view details ]

Project Scope
Construction of a solids dewatering facility, new filtrate pump station and sanitary pump station. Removal of existing thickened sludge pumps and demolition of an existing facility. Construction includes a new pre engineered metal building, earthwork, piping, paving, disinfection and testing.

Project:

Jupiter Water Treatment Plant Upgrades
High Service Pumps 13, 14 & 15
Town of Jupiter Water Treatment Plant

[ view details ]

Project Scope
Water treatment plant upgrades including demolition of existing diesel engine generator, motor control center and architectural modifications; installation of diesel engine generator and new pump station control room; demolition of high service pumps and control panels.

Project:

Backwash Recovery Basin
Backwash pond for lime filtration system
Village of Royal Palm

[ view details ]

Project Scope
Furnish & install 7500SF of pond liner, six submersible pumps, modify existing plant piping, provide all necessary earthwork and electrical items for a complete backwash water recovery system.

Project:

Hamilton Bay Pump Station
Storm Water Pump Station & Back-up Generator
City of West Palm Beach

[ view details ]

Project Scope
Installation of two storm water pumps and back-up generator building. Installation of inlet flume pipe, boardwalk, rip-rap headwall and discharge piping some 5,700 feet east of the project. Construction of a concrete pump vault and concrete discharge pressure vessel. Electrical instrumentation and controls. Final site work and testing.

Project:

Hillsboro Administration Complex
Administration Building
Coconut Creek, FL 33063

[ view details ]

Project Scope
Construction of new 2-Story 10,000 sq ft Admin., Bldg., Pump Bldg., and maintenance facility. Construction and testing of a 2.0 MGD prestress concrete finished water reservoir, High service pump station, site work and architectural features.

Project:

Big Cypress Wastewater Treatment Plant
Advanced wastewater treatment
Florida

[ view details ]

Project Scope
Mechanical subcontractor for the construction of a 400,000-gallon per day advanced wastewater treatment. Construction of new headworks, fine screens, vortex grit system, sequencing batch reactor, tertiary disk filters and service water pump station.

Project:

Reclaimed Water Storage & Pumping Facility
Water Storage & Pumping Facility
City of Boca Raton

[ view details ]

Project Scope
Construct a Reclaimed Water Storage and High Service Pump Station, 5 MG Reclaimed Water Ground Storage Tank. High service pumps we housed in a three thousand square foot building with heavy architectural features and extensive landscaping. Various size’s of offsite piping had to be brought in for the final service of the facility. The project was completed three month ahead of schedule.

Project:

Palm Beach County Odor Control Improvements
Odor Control Improvements
Southern Regional and Plant # 3

[ view details ]

Project Scope
Furnish and install new odor control scrubbers, chemical feed piping, chemical pumps and fiberglass ductwork and appurtenances. Project received bonus money for early completion.

Project:

North Miami Shores
Modifications to Aeration and Carbonair Units

[ view details ]

Project Scope
Installation of new third tray aeration unit; relocate two existing Carbonair tray aeration units; yard piping; fittings, valves and appurtenances for inlet and outlet piping to carbonair units; install antiscalant system; removal of existing lime system equipment and installation of new lime system equipment; new degasifiers for nanofiltration system; rehab of existing aquifer wells; electrical and I&C.

Project:

Village of Wellington
Reclaimed Water & Disinfection Facilities
Wellington, FL

[ view details ]

Project Scope
Installation of the first phase (1.0 MGD) of a reclaimed water treatment facility. The project includes filters and chlorine contact basin, materials & equipment including filter systems, backwash & dosing pumps, instrumentation and electrical system. Arcadis G & M

Project:

Village of Tequesta RO Water Treatment Expansion

Village of Tequesta, FL

[ view details ]

Project Scope
Construction of the second reverse osmosis train (1.2 MGD) in the existing 3.6 MGD R.O. Plant, equipping on of the new Floridian Aquifer wells, conversion from gas to bulk liquid chlorine and related electrical and control disiplines.

Project:

High Service Pumping Stations
Emergency Power Facility and WTP Modifications
Jupiter, Florida

[ view details ]

Project Scope
The construction projects over the past ten years have consisted of many varieties. Water Plant Expansions, High Service pumping stations, Reverse Osmosis supply wells, Generator housing and installation of instrumentation and controls as well as Chemical feed systems.

Project:

Yankee Lake Improvements & Greenwood Lakes
WWTF Biosolids Dewatering Improvements
Sanford & Lake Mary, Seminole Co., Florida

[ view details ]

Project Scope
Upgrading to 3.5 MGD, new equalization basin & pump station; construct modifications to existing fermentation basins; replace existing slide gates in biological process; replace existing diffusers; new sludge transfer pump station, four new submersible mixers; new Biosolids dewatering building; new filtrate return pump station.

Project:

City of Stuart Wastewater Treatment Facility
Wastewater Treatment Facility Capital Improvements
City of Stuart, Florida

[ view details ]

Project Scope
Construction of an anaerobic selector zone and fine bubble diffused aeration; modifications to the existing influent pump station; installation of weir washer system and air lift system at secondary clarifiers; installation of three manual telescoping valve.