City of Coconut Creek
Hillsboro Administration Complex
City of Boca Raton
Boca Raton Reclaimed Water Storage & Pumping Facility
Martin County Utilities
Martin County Iron Filter System
Jupiter Utilities Department
Jupiter Western Repump Station
Orange County
SWRF FOG & Septage
City of Stuart Utilities
Stuart Wastewater Treatment Facility
Palm Beach Water Utilities
Palm Beach County Odor Control Improvements
Jupiter Utilities Deparment
Jupiter High Service Pump
City of West Palm Beach
Palm Beach Solids Dewatering Plant
City of Moore Haven
Moore Haven Water System Improvements
Village of Wellington
Wellington Reclaimed Water & Disinfection Facilities
City of North Miami Beach
Norwood-Oeffler WTP VOC Removal Project
Broward County
Broward County 3-C
Town of Lantana
Lantana Water Treatment Plant
Immokalee Water & Sewer District
Immokalee Biosolids Dewatering
Village of Tequesta
Tequesta RO Water Treatment Expansion
analysis of environmental regulations Current Bid Projects

City of Hallandale Beach-WTP High Service Pumps Replacement

SUA-Digester Aeration, NRCY Pump Station & Misc. Electrical Improvements at the PGA WWTP

Town of Jupiter-Mobile Bed Absorber Improvements

City of Stuart-Per Chlorinated Chemical Treatment System

We will have more and more progress over the next few weeks and are excited in achieving our goals.

  • You will have LIVE updates on the operational website that we have already launched for FDC- http://www.floridadesigncontractors.com.php56-17.dfw3-1.websitetestlink.com/
    • This site it the backbone, over the next few weeks it will start to look more and more like the site that you want.
  • 1/11/17 Deign meeting @ FDC office
      • Scott & Craig will be on site (confirmed)
  • 1/18/17 First training session
    • Will go over log ins and basic overall look and feel of the back end
      • Craig & Scott will be on site (tentative)
  • 1/25/17 Load and run tests on Doc-Man system to mirror current system and file structure
    • Craig will be on site for this (tentative)
  • 2/1/17 Have all working tests on the system completed, load up Visual ID system
    • Craig and Bob will be on site for this (tentative)
  • 2/8/17 Launch new site in a secondary position run tests and shack down for next week url transfer. Have marketing of new site approved
    • Craig will be heading this task up
  • 2/14/17 Load new site marketing in to go (tentative)
  • 2/15/17 Launch of new site (tentative)

Our  Company

Florida Design Contractors, Inc. has brought together a team in which has provided a variety of construction and mechanical services for other municipalities in the South Florida area. Most of these projects have focused on the utility areas which have included water treatment plants, wastewater treatment plants, wastewater pump stations, force mains, water mains, ground storage tanks, repump stations, wellfields, and reclaimed water facilities. We have developed procedures for working together, which allows us to adequately construct these projects while minimizing the cost to the client.