https://bompar.com/wp-content/uploads/2023/01/index.html

https://cjbarrymores.com/wp-content/uploads/2023/01/index.html

https://claireguentz.com/wp-content/uploads/2022/01/index.html

https://cusointernational.org/wp-content/uploads/2020/08/index.html

https://dayvision.com/wp-content/uploads/2023/07/index.html

FDC Schedule
Seminole Tribe of Florida
Hollywood Reservation Ground Storage Tank
Seminole Tribe of Florida
Big Cypress Water Treatment Plant Chemical System Improvements
Orange County
SWRF FOG & Septage
City of Boca Raton
Wastewater Treatment Plant Primary Clarifier and Scum System Rehabilitation
City of Sunrise
Springtree Water Treatment Plant Water Stabilization and Solids Handling
Broward County
Broward County 3-C
City of Cape Canaveral
Wastewater Treatment Plant Improvement for Oxidation Ditch Rehabilitation
Palm Beach Water Utilities
Palm Beach County Odor Control Improvements
City of Coconut Creek
Hillsboro Administration Complex
City of Marco Island
RWPF Headworks Replacement
City of North Miami Beach
Norwood-Oeffler WTP VOC Removal Project
SFWMD
Miami Field Station and Miami South Tower IT Facility Buildings
Immokalee Water & Sewer District
Immokalee Biosolids Dewatering
City of Boca Raton
Rehabilitation of Membrane Pretreatment Pressure Filters
City of Boca Raton
Boca Raton Reclaimed Water Storage & Pumping Facility
City of Moore Haven
Moore Haven Water System Improvements
Village of Tequesta
Tequesta RO Water Treatment Expansion
City of Daytona Beach
Demonstration Testing System to Purify Reuse Effluent at the Westside Regional Water Reclamation Facility

Manatee County - Cortez Booster Pump Station Upgrades

Martin County - Martin Downs Water Repump Station Improvements

We will have more and more progress over the next few weeks and are excited in achieving our goals.

  • You will have LIVE updates on the operational website that we have already launched for FDC- http://www.floridadesigncontractors.com.php56-17.dfw3-1.websitetestlink.com/
    • This site it the backbone, over the next few weeks it will start to look more and more like the site that you want.
  • 1/11/17 Deign meeting @ FDC office
      • Scott & Craig will be on site (confirmed)
  • 1/18/17 First training session
    • Will go over log ins and basic overall look and feel of the back end
      • Craig & Scott will be on site (tentative)
  • 1/25/17 Load and run tests on Doc-Man system to mirror current system and file structure
    • Craig will be on site for this (tentative)
  • 2/1/17 Have all working tests on the system completed, load up Visual ID system
    • Craig and Bob will be on site for this (tentative)
  • 2/8/17 Launch new site in a secondary position run tests and shack down for next week url transfer. Have marketing of new site approved
    • Craig will be heading this task up
  • 2/14/17 Load new site marketing in to go (tentative)
  • 2/15/17 Launch of new site (tentative)

Our  Company

Florida Design Contractors, Inc. has brought together a team in which has provided a variety of construction and mechanical services for other municipalities in the South Florida area. Most of these projects have focused on the utility areas which have included water treatment plants, wastewater treatment plants, wastewater pump stations, force mains, water mains, ground storage tanks, repump stations, wellfields, and reclaimed water facilities. We have developed procedures for working together, which allows us to adequately construct these projects while minimizing the cost to the client.