Bid Bulletin Board

10/06/20 - City of Palm Bay - NRWWTP Clarifier No. 2

This project consists of the construction of Clarifier No. 2 including but not limited to installation of appropriate erosion and sediment controls; demolition of existing sludge drying bed underdrain piping; dewatering and excavation to the design elevations, preparation of subgrade and structural fill in accordance with project specifications, installation of underdrains; installation of reinforcement, form and pour concrete for new reinforced concrete tank; installation of various piping, valves, fittings, and brackets to connect the new process piping to the existing process piping; modification and connection to existing RAS Pump Station; backfill and compact material to final lines and grades; furnish and installation of new clarifier mechanism equipment and structures, platforms, supports, brackets, piping, valves and electrical and control components in the new cast-in -place concrete tank; furnish and installation of piping, valves, fittings, brackets, electrical and control conduit, wiring, panels, boxes, tubing, pneumatic components, solenoids, meters, transmitters and actuators on the exterior of the tank; and paint and coat all concrete and metal surfaces including treatment tank, process equipment, piping, fittings, valves, actuators, brackets/supports, panels and conduit.

01-Addenda
02-Technical Specifications
03-Drawings