12/14/2022 - City of West Palm Beach - ECR-Effluent Transfer Pumps Replacement

This project consists of the removal and replacement of two (2) vertical turbine pumps, including removal and replacement of the VFDs, PLC, and all existing instrumentation, and all ancillary construction for teh Effluent Tranfer pump Station at the ECRWRF.  Project includes furnishing and installing replacement Flowserve vertical turbine pumps in the existing pump cans, complete with all electrical and controls improvements including VFD and instrumentation replacement and PLC programming, as well as any related work required to integrate the complete and working pumps to the plant facilities.