Owner: |
Broward County |
Engineer: |
CDM Smith |
Project: |
Facility 3A Lime Process Demolition |
Value: |
$1,750,283.44 |
Scope: |
The Facility 3A Lime Process Demolition project for Broward County consisted of the demoliton and disposal of the lime softening process equipment, buildings, tankage, piping, fittings, power generator, muffler, day tanks, automatic transfer switch, vertical turbine pumps, horizontal pumps, steel bars, reinforced concrete, slabs, rebar, steel plate structures, steel frames, anchors, straps, fasteners, metering pumps, chemical mixers, treatment unit, lime silo, washwater recovery, sump pumps, raw water wells at multiple sites, vaults, hatches, fence, gate, chemical tanks, slakers, drains, lighting, water main pipe, force main pipe, storm water pipe, clean outs, sinks, cabinets, ceiling, hardware, plumbing, electrical, controls, clear well, filters, motor control centers, electrical panels, control panels, supports, conduit, wire, motors, chemical storage tanks, chemicals, fuel diesel storage tank, laboratory, lavatory, offices, stairs, guard rail, steps, lights, ceilings, floors, walls, walk ways, roof, fans, air conditioning, windows, doors, hatches, foundations, valve boxes, valves, sidewalk, meters vaults, raw water vaults, asphalt, lead based paint abatement, asbestos, containing material abatement and chemicals removal. Work also included new electrical and control systems installation and training, testing, start-up services. |