Owner: |
City of Cape Coral |
Engineer: |
CDM Smith |
Project: |
Southwest Water Reclamation Facility Southwest Water Treatment Plant IW-2 Piping Integration |
Value: |
$1,049,800.00 |
Scope: |
The Southwest Water Reclamation Facility Southwest Water Treatment Plant IW-2 Piping and Integration project for the City of Cape Coral consisted of the construction of the piping to connect the Southwest Water Treatment Plant (SWWTP) and Southwest Water Reclamation Facility(SWWRF) to a new Class I Injection Well at the SWWTP/SWWRF site. The piping connected the 24" SWWRF reclaimed water distribution line and the SWWTP reverse osmosis (RO) concentrate line to the new IW-2 well being constructed. Work included construction/installation of piping and valves, connection to existing lines, connection to new IW-2 well, testing of system piping, connection of instrumentation, power service, concrete pads and pillars, metal platforms, fencing, mechanical, electrical and structural work, general site work, site restoration, landscaping restoration, and miscellaneous permitting. |