Owner: |
City of Cooper City |
Engineer: |
Hazen and Sawyer |
Project: |
Lift Station 2 & Lift Station 49 Upgrades |
Value: |
$602,639.00 |
Scope: |
The Lift Station 2 and Lift Station 49 Upgrades project for the City of Cooper City consisted of the demolition of the existing lift stations, installation of new precast concrete underground valve vault and wet well top slab, modifications and improvements to existing wet well, mechanical valves and piping, new force main piping from lift station to existing force main, tie-ins to the existing force mains, installation of new electrical service, installation of new pump control panels and connection to existing telemetry units, application of new coatings to interior of existing lift station well, as well as, landscaping and surface restoration at work sites. |