Owner: |
City of Dunedin |
Engineer: |
Tetra Tech |
Project: |
Dunedin Reclaimed Water Storage TAnk and Pump Station |
Value: |
$2,470,722.00 |
Scope: |
The Dunedin Reclaimed Water Storage Tank and Pump Station project for the City of Dunedin consisted of the installation of a 2.0 MG reclaimed water storage tank, reclaimed water high service pumps, monitoring building, and related electrical and instrumentation systems. Work also included the removal of existing 8" and 24" abandoned storm pipes, all site preparation including tree removal and tree protection, installation of all footer and foundation requirements for all permanent structures, fabrication and installation of abovementioned equipment, and site restoration. |