Owner: |
Hernando County |
Engineer: |
Arcadis |
Project: |
Seville Water Treatment Facility Modifications |
Value: |
$2,754,525.00 |
Scope: |
The Seville Water Treatment Facility Modifications project for Hernando County consisted of the installation of a production well, submersible well pump, associated piping, valves, and appurtenances; installation of a prefabricated, pre-engineered pump station to include four (4) high service pumps with variable frequency drives, a motor control center, a flow paced sodium hypochlorite disinfection system, a bridge crane, a flow meter, HVAC system, and other ancillary components; installation of a 0.75 million gallon pre-stressed concrete GST, tank mixing system, associated piping, valves and appurtenances; installation of chemical feed piping to two chemical injection points for pre and post disinfection; installation of 6" to 12" diameter yard piping and valves and modification of the existing piping to facilitate the connection of the existing distribution system to the new pumping system; installation of a standby generator system; construction of a paved access road and installation of site fencing and site lighting; addition of hardware, software and wiring associated with the County's Dataflow system; general site work including clearing and tree removal, grading and earthwork, construction of a stormwater pond and landscaping; and demolition of miscellaneous items. |