Owner: |
City of North Miami Beach |
Engineer: |
Arcadis |
Project: |
Norwood-Oeffler Water Treatment Plant Lime Silo No. 2 Slaker Installation & System Improvements |
Value: |
$238,208 |
Scope: |
The Norwood-Oeffler Water Treatment Plant Lime Silo No. 2 Installation and System Improvements project for the City of North Miami Beach consisted of furnishing, delivering and installing all materials, equipment and services for the construction of the facilities including the following elements: removal (demolition) of existing lime system equipment at Silo No. 2; furnish and install new lime system feed equpment associated with Silo No. 2, and lime slurry dosing assemblies at existing Hydrotreator No. 2 and 3; removal (demolition) of existing lime slake and feed system at Silo No. 2; install new slaker; removal (demolition) of existing rectangular lime slurry tank and circular lime recirculation tank and equipment; furnish and install new lime slurry feed tank; as well as electrical work. |