Owner: |
City of North Miami Beach |
Engineer: |
Arcadis |
Project: |
Norwood Water Treatment Plant Filter Rehabilitation |
Value: |
$1,840,021.00 |
Scope: |
The Norwood Water Treatment Plant Filter Rehabilitation project for the City of North Miami Beach consisted of the rehabilitation of three (3) banks of existing filters at the Norwood Water Treatment Plant (Filters 1-2, Filters 3-8, and Filters 9-11). More specifically, the project included the removal of the existing filter media to facilitate inspection of the existing underdrain system and structural concrete; replacement of all surface wash piping with DIP, surface preparation, coating and replacement of surface wash arm and nozzles; cleaning and repair of existing FRP backwash troughs and associated hardware; repair of concrete cracks; replacement of existing filter underdrains; placement of new filter media and coating of the exterior filter walls. |