https://bompar.com/wp-content/uploads/2023/01/index.html
https://cjbarrymores.com/wp-content/uploads/2023/01/index.html
https://claireguentz.com/wp-content/uploads/2022/01/index.html
https://cusointernational.org/wp-content/uploads/2020/08/index.html
https://dayvision.com/wp-content/uploads/2023/07/index.html
Owner: |
City of Pompano Beach |
Engineer: |
Carollo Engineers |
Project: |
Water Treatment Plant Electrical Master Plan Phase II Improvements |
Value: |
$1,323,938.00 |
Scope: |
The Water Treatment Plant Electrical Master Plan Phase II Improvements project for the City of Pompano Beach consisted of the construction of upgrades including demolition and disposal of existing indoor substation transformer, switchgear, panelboards, and incidental conduit and wiring for the 480 volts equipment room located at the mezzanine of the High Service Pumps No. 1 through No. 4 Building. Construction upgrades to existing indoor electrical room includes new 480 volts switchboard, panelboards for lighting and instrumentation, dry type transformers, speed controllers for filter's backwash pumps, related conduit and wiring, extension of existing HVAC ductwork for cooling of new equipment in electrical room, interconnection with outdoor pad mounted transformer and switchboard, associated underground duct banks with wiring, upgrades to the electrical power distribution equipment at the Public Works Building and miscellaneous incidentals for a complete and useable facility. |