Owner: |
South Central Regional WWT & Disposal Board |
Engineer: |
Hazen and Sawyer |
Project: |
Plant B Secondary Clarifier Rehabilitation |
Value: |
$1,982,037.00 |
Scope: |
The Plant B Secondary Clarifier Rehabilitation for the South Central Regional Wastewater Treatment and Disposal Board consisted of the installation of clarifier mechanism equipment within three existing Plant B secondary clarifiers including drive units, center columns, sludge withdrawal systems, influent feed wells, and scum removal systems; replacement of the Plant B RAS pump station motor control center; general rehabilitation and improvements to the Plant B RAS Pump Station building; demolition of the existing grit loading ramp and design of a new sludge truck wash station; and Administration Building area parking lot and entrance drive repaving and fence alignment. The installation, rehabilitation, replacement, construction and modification/ improvements included startup and testing of the new facilities, site restoration, operation and maintenance manuals, record documents, facility staff training, spare parts, equipment startup and testing and all other appurtenant and miscellaneous work required for the completion of work in accordance with the Contract Documents. |