Owner: |
Seminole County, Florida |
Engineer: |
AECOM USA, Inc. |
Project: |
Yankee Lake WRF & Greenwood Lakes WWTF |
Value: |
$9,768,661 |
Scope: |
This project included a complete plant(s) upgrade to a full capacity of 3.5 MGD. The upgrades for the Greenwood Lakes WRF included; removal of the existing dewatering equipment and replacement with a belt filter press system, dewatering building structural and architectural upgrades, and electrical and PLC modifications. The Yankee Lake WRF upgrades included; construction of a new (5) dry-pit submersible equalization pump station, construction of a 1.7 MG pre-stressed concrete ground storage tank equalization basin, fine bubble diffused aeration and gate modifications to an existing BNR Basin, construction of a (3) submersible pump belt filter press lift station, addition of a hydraulic mixing (2) pump station and aeration modifications to (2) sludge holding tanks, construction of a new (5) belt filter feed and return pump station, construction of a new pre-manufactured dewatering building and associated belt filter feed press system, construct a new MCC Building and electrical upgrades, yard piping, and site improvements. |