Owner: |
South Florida Water Management District |
Engineer: |
South Florida Water Management District |
Project: |
IT Shelters Replacement Hendry & Palm Beach Counties |
Value: |
$2,286,592 |
Scope: |
The IT Shelters Replacements project for the South Florida Water Management District consisted of the replacement of the existing communications equipment shelter building including furnishing and installing new communications support equipment, installation of a new ground grid and installation of new communications cabling at four (4) separate sites throughout Hendry and Palm Beach Counties. The scope of work more specifically included preparation of the site for installation of new, precast concrete microwave equipment building with a generator room; installation of new precast concrete microwave equipment building; installation of new access driveway; installation of new generator and underground fuel system; installation of new grounding system for the new building, existing tower, and site as indicated; design, furnish and installation of new cable waveguide/ice bridge from the building to the tower; installation of new electrical service connection tot he new building include hand hole, isolation transformer, and service disconnect; provide new outside plant (OSP) communications cable and conduits; installation of new air conditioning units; transfer equipment racks from existing shelter building to the new shelter building; grading of the project site to final; installation of sodding and landscaping. Existing on-site communications equipment remained in-service during project work, including tower and shelter building equipment and site communications cabling network. |