Owner: |
City of Stuart, Florida |
Engineer: |
Brown and Caldwell |
Project: |
Capital Improvements Project |
Value: |
$4,327,408 |
Scope: |
The City’s WRF is a conventional activated sludge treatment facility that was original build in 1955. In 2008 the City was looking to refurbish some aging systems which included; construction of an anaerobic selector zone and fine bubble diffused aeration system, modifications to an existing influent pump station, installation of a weir washer system and air lift system at the secondary clarifiers, and installation of (3) manual telescoping valves. |