Owner: |
Village of Tequesta |
Engineer: |
Malcolm Pirnie/Arcadis |
Project: |
Phase II & III - RO Expansion |
Value: |
Phase II - $2,622,000 |
Scope: |
The Reverse Osmosis Water Treatment Plant included an existing 1.2 MGD RO System with the space to upgrades to a 3.6 MGD facility. The 2.4 MGD upgrade was conducted in two separate projects. The first upgrade consisted of adding one 1.2 MGD skid in 2006-2007 and then followed by a third and finall 1.2 MDG skid in 2010-2011. Addition of the 2.4 MGD capacity also required addition of; two micron cartridge filters, two 1,400 gpm Horizontal Well Pumps, 1,600 gpm Horizontal Split Case High Service Pump, 2,500 gpm Vertical Turbine Clearwell Transfer Pump, two 1,250 gpm Vertical Turbine RO High Pressure Pumps all associated piping and valve modifications, electrical and I&C upgrades and minor architectural and structural upgrades. A new Odor Control System was installed to remove the odors which consisted of; one degasifier, two two-stage scrubbers, two recirculation pumps, PVC piping and FRP ductwork. Lastly, demolition of the existing chlorine gas system and replacement with a liquid Sodium Hypochlorite system. The new chemical system included a prefabricated concrete building for the five chemical transfer pumps and a cast-in-place containment area for the two 8,750 gallon FRP bulk Sodium Hypochlorite storage tanks. |
Folder 07/07/2022 - Manatee County - Lift Stations 1M, 12A, 13A Electrical Rehabilitation
Folder 07/08/2022 - City of Boca Raton - Reclaimed Water Disinfection and Compliance Upgrades
Folder 07/06/2022 - Martin County - North WTP Feedwater Pump & VFD Replacement
Folder 07/12/2022 - City of Ormond Beach - WRF Clarifier Improvements
Folder 07/12/2022 - City of Daytona Beach - Heineman Street Potable Water GST & Pump Station