Owner: |
City of West Palm Beach |
Engineer: |
Hazen and Sawyer |
Project: |
East Central Regional Water Reclamation Facility Blower No. 10 Addition Installation |
Value: |
$398,000.00 |
Scope: |
The East Central Regional Water Reclamation Facility (ECRWRF) Blower No. 10 Addition Installation project for the City of West Palm Beach consisted of the construction and installation of a complete blower system including one (1) electric motor driven, multi-stage centrifugal blower, steel base, inlet and discharge expansion joints, suction and discharge piping, isolation valves, check valves, inlet throttling and bypass valves with electric actuators, blower local control panels (LCPs), electrical power distribution, instrumentation, concrete equipment pads and all necessary auxiliary equipment, appurtenances, accessories required for a complete blower system. The ECRWRF is a 70 MGD wastewater treatment facility located in West Palm Beach, Florida. |
Folder 07/07/2022 - Manatee County - Lift Stations 1M, 12A, 13A Electrical Rehabilitation
Folder 07/08/2022 - City of Boca Raton - Reclaimed Water Disinfection and Compliance Upgrades
Folder 07/06/2022 - Martin County - North WTP Feedwater Pump & VFD Replacement
Folder 07/12/2022 - City of Ormond Beach - WRF Clarifier Improvements
Folder 07/12/2022 - City of Daytona Beach - Heineman Street Potable Water GST & Pump Station