Owner: | City of West Palm Beach |
Engineer: | Metcalf & Eddy |
Project: | Solids Dewatering Plant Construction |
Value: | $1,482,000.00 |
Scope: | Construction of a solids dewatering facility, new filtrate pump station and sanitary pump station. Removal of existing thickened sludge pumps and demolition of an existing facility. Construction includes a new pre engineered metal building, earthwork, piping, paving, disinfection and testing. |